| Resource Type | Description |
|---|---|
|
Case Study pdf (178 KB) |
Design and Construction Oversight of a Pond Upgrade and Stormwater Bumpouts at Pine Grove Terrace, Morehouse Brook, WinooskiIn 2018, the Chittenden County Regional Planning Commission (CCRPC) and the City of Winooski hired Stone to develop a concept (30%) design for stormwater improvements to address runoff from public highways and directly connected residential impervious surfaces in the Pine Grove Terrace development. The development is located in the Morehouse Brook watershed, which has an approved flow restoration plan (FRP) developed by Stone under an engineering partner in 2013-2017. |
|
External Links and Resources png (95 bytes) |
Stone email pixel |
|
External Links and Resources jpg (29 KB) |
Stone email signature logo |
|
Case Study pdf (266 KB) |
Environmental Review and Asbestos Remediation at Bolton Valley ResortBolton Valley Resort and the Town of Bolton were awarded a Community Development Block Grant to upgrade the existing Bolton Valley Community Water System with a new surface water treatment facility and rehabilitation of existing surface water intakes, and to perform major renovations to the Bolton Valley Hotel. |
|
Case Study pdf (162 KB) |
Redevelopment of Northfield Savings Bank Flagship BranchIn September 2015, Northfield Savings Bank retained Stone to perform environmental due diligences services as part of the redevelopment planning for proposed Northfield Savings Bank facility upgrades at 33 South Main Street in Northfield, Vermont – the original location for the 150-year old financial institution. |
|
News |
News and Updates from Our Environmental Assessment and Remediation TeamStone Environmental is excited to provide an update on work at the Jones & Lamson brownfield site in Springfield, Vermont and introduce you the newest members of our Environmental Assessment and Remediation Team. |
|
Case Study pdf (234 KB) |
Area-Wide Planning in VermontRead this multiple-project case study focusing on area wide planning as part of a comprehensive redevelopment plan for brownfield and vacant or underutilized sites. |
|
Case Study pdf (287 KB) |
Hands Mill Dam Removal, 30% and Final Engineering DesignThe Hands Mill Dam is a partially breached stone masonry and concrete dam located along the Jail Branch in Washington, Vermont. The dam is currently owned by the Town of Washington and was classified as a Class 2 “significant hazard dam” in 2016 by the VT Department of Environmental Conservation Dam Safety Program. |
|
Case Study pdf (181 KB) |
Investigating potential source areas at Energizer, St. AlbansEnergizer Battery Manufacturing, Inc. operated a battery and flashlight manufacturing facility in St. Albans, Vermont from 1947 until 2013. Manufacturing processes utilized bulk quantities of the chlorinated solvent trichloroethylene (TCE), primarily for degreasing and parts cleaning. Storage and use practices at the facility resulted in releases of TCE to building materials and the subsurface. |
|
Case Study pdf (233 KB) |
Former Jerry's NissanJerry's Nissan in Rutland, Vermont operated as an automobile sales and service center property from 1974 until it’s closure in 2014. The Vermont Electric Power Company (VELCO) recently retained Stone Environmental, Inc. to perform Phase I and II environmental site assessments (ESAs) of the property prior to their potential purchase of the property. |