| Resource Type | Description |
|---|---|
|
White Papers and Technical Articles pdf (71 KB) |
Manuscript Abstract - A Field Spray Drift Study to Determine the Downwind Effects of Isoxaflutole Herbicide to Non-target PlantsDownload the abstract for Stone and Intrinsik's manuscript, “A Field Spray Drift Study to Determine the Downwind Effects of Isoxaflutole Herbicide to Non-target Plants,” to be published in Integrated Environmental Assessment and Management. |
|
Presentation pdf (84 KB) |
ACS Fall Meeting 2021 Presentation Abstract - Lessons Learned from Two Years of Off Target Movement Field StudiesLearn more about Stone’s presentation, “Lessons Learned from Two Years of Off-target Movement Field Studies,” at the 2021 ACS fall meeting in the session Off-Target: Measurement & Management of Pesticide Drift & Volatility on Wednesday, August 25th. |
|
Case Study pdf (143 KB) |
Burlington Wards 5 & 6 Right of Way Condition InventoryStone worked with the Chittenden County Regional Planning Commission and the City of Burlington Department of Public Works to develop and implement this extension of developing the Burlington Integrated Water Quality Management Plan (see related project description above). |
|
Case Study pdf (451 KB) |
Designing Stormwater Pond Filters for Phosphorus RemovalStormwater wet ponds are ideal facilities for filter-based retrofits that enhance phosphorus (P) removal from pond outflow and thus reduce P loading to receiving waters. |
|
Case Study pdf (163 KB) |
Future Railyard Enterprise Connector Road, Stormwater Engineering Feasibility AssessmentStone is working with the Chittenden County Regional Planning Commission and the City of Burlington to assess the site and identify possible practices and strategies to mitigate flooding issues in the vicinity of the Burlington Railyard, at the future location of the Railyard Enterprise Project (REP) and adjacent to the City's Main Wastewater Treatment Plant (WWTP). Read on for more. |
|
Case Study pdf (199 KB) |
Plainfield Recreation Road Erosion and Gully Alternatives Analysis and Conceptual DesignsStone worked with the Friends of the Winooski River and the Town of Plainfield to complete a hydrologic study and alternatives analysis for a steep drainage that extends from just above Lower Road to the Winooski River in Plainfield, Vermont. |
|
Case Study pdf (360 KB) |
Morehouse Brook Flow Restoration Planning, Stormwater Scoping, Design, and Construction OversightMorehouse Brook has been designated impaired by the Vermont Agency of Natural Resources (ANR) due to uncontrolled stormwater runoff. |
|
Case Study pdf (146 KB) |
Infiltration Retrofit in the Helen Avenue Cul-de-Sac, Design Phase EngineeringThe City of South Burlington contracted Stone to advance design of an infiltration practice or practices in the Helen Ave. cul-de-sac as identified in the Potash Brook Flow Restoration Plan (FRP). |
|
Case Study pdf (301 KB) |
Integrated Water Quality Management Planning, Burlington, VermontStone is part of a consulting team selected by the City of Burlington Department of Public Works to develop an Integrated Water Quality Management Plan for the entire City. |
|
Case Study pdf (130 KB) |
Phosphorus Control Plans for Essex Junction and Essex Town, VermontStone led a team of consultants and engineers selected by the Essex Junction and Essex Town MS4s to develop a Phosphorus Control Plan (PCP) including both municipalities. |