| Resource Type | Description |
|---|---|
|
Case Study pdf (148 KB) |
Corrective Action Plan Implementation, Caledonia Spirits, Montpelier, VermontIn 2016, Stone was retained by Caledonia Spirits to perform a Phase I Environmental Site Assessment (ESA) prior to purchasing the property. Stone identified recognized environmental conditions and assisted Caledonia Spirits in entering the Brownfields Program (BRELLA). Subsequently, Stone performed a Phase II Environmental Site Assessment and identified polycyclic aromatic hydrocarbon (PAH) contamination in soils above industrial State standards. |
|
Case Study pdf (184 KB) |
Long Falls Paperboard - Phase II Environmental Site AssessmentThe Vermont Department of Environmental Conservation (VT DEC) and the Town of Brattleboro, Vermont, contracted with Stone Environmental to perform a Phase II Environmental Site Assessment (Phase II ESA) for an active paperboard manufacturing facility that has operated since 1960. |
|
Case Study pdf (262 KB) |
Program Management, Environmental Assessment, and Remediation of the Rutland County Parent-Child Center in Rutland, VermontStone has served as Program Manager and Clerk of Works for the Rutland County Parent-Child Center (RCPCC) Chaplin Family Campus project since 2017. |
|
Case Study pdf (197 KB) |
351 Pine Street BERA RedevelopmentStarting in 2012, Stone Environmental, Inc. (Stone) performed a Phase I/II Environmental Site Assessment (ESA) of a former rail yard at 351 Pine Street in Burlington, Vermont, a Site slated for redevelopment as part of the City of Burlington’s Railroad Enterprise Project and relocation of a portion of the Burlington Railyard. |
|
Case Study pdf (250 KB) |
Brownfield Remedial Planning and Implementation for the Former Fellows Gear Shaper Facility, Springfield, VermontIn 2010, Stone was retained to serve as the Qualified Environmental Professional during the implementation of a VTDEC approved Corrective Action Plan and a US EPA TSCA Division Risk-Based Cleanup Plan at the former Fellows Gear Shaper facility located in Springfield, Vermont. |
|
Case Study pdf (172 KB) |
Muriel B. Harris Trust - Evaluation of Corrective Action AlternativesThe West Burke Pumping Station was developed in 1941 to pump crude oil and was operated by Portland Pipe Line Corporation (PPLC). The Property contains two right-of-way easements: one for high-pressure crude oil pipelines and the other for a utility corridor. |
|
Case Study pdf (185 KB) |
Youngs Landfill – Phase II Environmental Site AssessmentThe Youngs Landfill started operation as a solid waste landfill in 1967. The landfill was closed in 1985 by the Vermont Department of Environmental Conservation (VT DEC) Solid Waste program. Environmental assessment started at the Young’s Landfill in 1989. |
|
Case Study pdf (231 KB) |
Comtu Falls - Phase II Environmental Site AssessmentThe Comtu Falls building currently houses a small-scale hydroelectric facility on the first floor and is vacant on the second and third floors. Textile manufacturers occupied the property from 1871 until 1952, a machine shop from 1952 until 1972, and a plastic molding manufacturer from 1972 until 1981. Redevelopment of the building will include commercial and retail on the first and second floors, with residential housing on the third. |
|
Case Study pdf (238 KB) |
Applying a Wetland Monitoring Analysis to Protect Arable LandStone conducted a geospatial analysis to determine how the creation of protective buffer zones of varying sizes around wetlands would affect the arable land area available for three different crops in three Canadian Provinces. |
|